HP StorageWorks Interface Manager and Command View TL Installation Guide (March 2005)
Table Of Contents
- Title
- Contents
- About this Guide
- 1: Introduction
- 2: Hardware Installation
- Preparing the Installation
- Installing the Expansion Cage in the ESL Series Library
- Installing the Fibre Channel Interface Controllers into the Expansion Cage
- Installing the Interface Manager Card into the Expansion Cage
- Connecting the Cables
- Connecting the Interface Manager Card to the Fibre Channel Interface Controllers
- Connecting the SCSI Bus Cables
- Connecting the Fibre Channel Cables
- Connecting the Interface Manager Card to the LAN
- Connecting the PC or Laptop
- Completing the Hardware Installation
- 3: Configuration and Software Installation
- 4: Troubleshooting
- A: Serial and Ethernet Pin Assignments
- B: Regulatory Compliance Notice
- Federal Communications Commissions Notice
- Harmonics Conformance (Japan)
- German Noise Declaration
- C: Electrostatic Discharge
- D: Specifications
- Index
Hardware Installation
50 Interface Manager and Command View TL Installation Guide
Completing the Hardware Installation
After installing the required hardware:
1. Verify that filler panels are installed in all unused slots in the expansion cage.
2. Push the electronics bay back into the library cabinet and finger-tighten the
two thumbscrews to secure the electronics bay in place.
3. Power on the library using the following sequence:
a. Turn on both circuit breakers on the AC power distribution assembly.
b. Verify that all access panels are closed, all back panel cable connections
are firmly in place, and all doors are closed.
c. Turn on the power switch located below the control panel.
4. If necessary, see Troubleshooting in this guide or the troubleshooting chapter
in the HP StorageWorks e2400-160 Fibre Channel Interface Controller User
Guide to resolve any POST diagnostic issues.
5. After successfully installing the hardware, proceed to Configuration and
Software Installation.