Hitachi Dynamic Link Manager Software Users Guide for AIX (6.6) (T5208-96010, April 2011)

4. HDLM Operation
207
HBA to the LUN security.
6. Execute the following command:
# diag
Note
For details on the operations after executing the
diag command, see the AIX
documentation. Steps 7 to 14 below provide an example of the execution
procedure for AIX V6.1 (Technology Level 02).
7. From the displayed menu, choose Task Selection.
The Task Selection List window appears.
8. Choose Hot Plug Task.
The Hot Plug Task window appears.
9. Choose PCI Hot Plug Manager.
The PCI Hot Plug Manager window appears.
10. Select List PCI Hot Plug Slots to check the PCI slot to be replaced:
The shading indicates the PCI slot where the HBA is to be replaced.
11. Go back to the PCI Hot Plug Manager window, select Unconfigure a Device, and
enter in Device name the device that is to be replaced.
For the Unconfigure any Child Devices and KEEP definition in database
items, select yes.