Hitachi Dynamic Link Manager Software Users Guide for AIX (6.6) (T5208-96010, April 2011)

8. Messages
360
Statistics to the Initial Value). For details on the set operation, see 6.6 set (Sets
Up the Operating Environment).
KAPL01050-I
The currently selected paths will be changed to the Online
status. Is this OK? [y/n]:
Details
The
online operation will be started. To continue the online operation, enter
y. To cancel the operation, enter n.
Action
If you want to execute
online processing, enter y. If you want to terminate
processing, enter
n. For details on the online operation, see 6.5 online (Places
Paths Online).
KAPL01051-I
Because no path has been selected among the currently displayed
paths, the paths in the Offline(C), Offline(E), and Online(E)
statuses will be changed to the Online status. Is this OK? [y/n]:
Details
All the paths will be placed Online because the path selection parameter is not
specified for the
online operation. To place all the paths Online, enter y. To
cancel the operation, enter
n.
Action
If you want to execute
online processing, enter y. If you want to terminate
processing, enter
n. Before you execute the processing, be sure to execute the
view operation of the HDLM command (dlnkmgr) to check the path status. For
details on the
view operation, see 6.7 view (Displays Information). For details
on the
online operation, see 6.5 online (Places Paths Online).
KAPL01052-I
The currently selected paths will be changed to the Offline(C)
status. Is this OK? [y/n]:
Details
The
offline operation will be started. To continue the offline operation, enter
y. To cancel the operation, enter n.
Action
If you want to execute the offline processing, enter
y. If you want to terminate
processing, enter
n. For details on the offline operation, see 6.4 offline
(Places Paths Offline).