- HP 10000 G2 Series Rack Options Installation Guide

Tie-Down kit 120
3.
Insert and partially tighten four bolts with washers, securing the front tie-down to the front caster plate.
4. Align the rear tie-down with the holes on the rear caster plate (1).
5. Insert the four spring clips (2), and then partially tighten four bolts with washers (3), securing the rear
tie-down to the rear caster plate.
6. Tighten the bolts from step 3.
7. Tighten the bolts from step 5.
8. Secure the rack to the floor ("Securing the rack to the floor" on page 121).
Installation is complete.