- HP 10000 G2 Series Rack Options Installation Guide

Tie-Down kit 122
1.
Adjust the leveling feet on the rack so that the full weight of the rack rests on the leveling feet.
2. Align the front tie-down with the holes on the front caster plate.
3. Insert and then partially tighten four bolts with washers, securing the front tie-down to the front caster
plate.
4. Align the rear tie-down with the holes on the rear caster plate (1).
5. Insert the six bolts with washers (2), securing the rear tie-down to the rear caster plate.
6. Tighten the bolts from step 3.
7. Tighten the bolts from step 5.
8. Secure the rack to the floor ("Securing the 1200 mm full frame rack to the floor" on page 123).
Installation is complete.