- HP 10000 G2 Series Rack Options Installation Guide

Ground Bonding kit 57
3.
Place the end of the 15.24-cm (6-in) grounding strap over the grounding lug on the top side panel.
4. Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the top side
panel and tighten.
5. Repeat steps 1 through 4 for the other top side panel.
Installing the ground bonding rack option kit on HP 10000 G2
Series Rack fan kits
From the grounding lug on the rack top to the grounding lug on the fan kit:
1. Place one end of a 15.24-cm (6-in) grounding strap over the grounding lug on the rack top.
2. Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the rack top
and tighten.
3. Place the other end of the same grounding strap over the grounding lug on the perforated panel.