- HP 10000 G2 Series Rack Options Installation Guide

Ground Bonding kit 58
4.
Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the perforated
panel and tighten.
From the grounding lug on the fan kit to the grounding lug on the egress slot:
1. Place one end of a 36.83-cm (14.5-in) grounding strap over the grounding lug on the fan kit.
2. Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the fan kit and
tighten.
3. Place the other end of the same grounding strap over the grounding lug on the egress slot.
4. Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the egress slot
and tighten.