HP 1405 Switch Series Installation and Getting Started Guide (May 2013)

2-6
Installing the HP 1405 Switches
Installation Procedures
LED Behavior
After Initialization:
•The Power LED remains on.
•The Port Status LEDs on the front of the switch go into their normal
operational mode:
If the ports are connected to active network devices, the Port
Status LEDs stay on or may be blinking to indicate port activity.
If the ports are not connected to active network devices, the
Port Status LEDs will stay off.
If the LED display is different than what is described above, the self test
has not completed correctly. Refer to chapter 3, “Troubleshooting” for
diagnostic help.
3. Mount the Switch
After the switch passes self test, it is ready to be mounted in a stable location.
The switch can be mounted in these ways:
on a wall or under a horizontal surface
on top of a horizontal surface
Wall Mounting
You can mount the switch on a wall. A special kit for wall mounting is included
with the switch. Note that this kit can also be used to mount the switch under
a horizontal surface, such as a table.
For wall or under-surface mounting, make sure the rubber feet are not
attached.
Caution The switch should be mounted only to a wall or wood surface that is at least
1/2-inch (12.7 mm) plywood or its equivalent.
1. In the required location, mark the position for the mounting screws. See
the Quick Setup Guide that was included with your switch for the distance
between the holes.
2. Use a Phillips #2 (cross-head) screwdriver and two 3.5mm tapping screws
to mount the switch on the wall or wood surface.
For the 1405-5, 1405-5G, 1405-8, and 1405-8G Switches, screws and wall
anchors are included in the accessory kit for use with plastered brick or
concrete walls.