Installation Guide for fl Modules 2007-02
ProCurve Switch fl Modules
Installing Modules
Installing Modules
Installation procedures are similar for all modules. However, because there
are three different types of modules—switch fabric, management, and
interface modules—make sure that you insert each module in its appropriate
slot. See the following sections for details.
Types of Modules Supported
A ProCurve Switch 8100fl supports three types of modules:
■ Switch fabric modules (half-height modules for the Switch 8108fl; full-
height modules for the Switch 8116fl) are installed in the central slots
labeled FM. Install the primary switch fabric module in slot FM-A; install
the redundant switch fabric module into slot FM-B. (You can use either
slot in a single switch fabric module installation.)
■ Management modules (thicker, half-height modules) are installed in slots
labeled MM.
• If you are installing only one management module, you can install it
in either slot MM-A or MM-B.
• If you are installing two management modules, the primary manage-
ment module is the one installed in slot MM-A. The redundant
management module is the module installed in slot MM-B.
■ Interface modules (narrow half-height modules) are installed in
numbered slots (1-8 on the Switch 8108fl; 1-16 on the Switch 8116fl).
Installation Overview
You can install modules in the switch both when the switch is powered on and
when the switch is powered off. The procedures described in this chapter
assume that the switch is powered on.
1. Install each module in its appropriate slot by following one of these
procedures:
• For a switch fabric module, see “Installing a Switch Fabric Module”
on page 11.
• For a management module, see “Installing a Management Module” on
page 13.
• For an interface module, see “Installing an Interface Module” on
page 15.
8