3PAR CIM API Programming Reference for InForm OS 2.3.1 (320-200164 Rev B, February 2010)

5.79
Copy Services Subprofile
CIM API Programming Reference
The method execution, if successful, always returns 0x1000, which means that job has started.
A client can either monitor
Job.OperationalStatus for job completion or wait for the
modification of
OperationalStatus for a ConcreteJob to indicate ‘Complete’ and ‘OK’ or
‘Complete’ and ‘Error’.
STATE TRANSITIONS
Table 5-37 shows the values for SyncState and WhenSynced during various stages of
physical copy resynchronization.
Table 5-37. State Transitions for Physical Copy Resynchronization
Operation SyncState WhenSynced
Resync in progress ResyncInProgress (5) Previous sync time
Resync complete Frozen (14) Time of when resync is
completed
Resync Failed Broken (12) Previous sync time