HP BLc QLogic 4X QDR InfiniBand Managed Switch and InfiniBand Switch Management Module Installation Guide for HP c-Class BladeSystems
Table Of Contents
- Contents
- Preparing for Installation
- Hardware Installation
- Installing an HP BLc QLogic 4X QDR InfiniBand Managed Switch
- Installing InfiniBand Cables in an HP BLc QLogic 4X QDR InfiniBand Managed Switch
- Removing an InfiniBand Cable from the HP BLc QLogic 4X QDR InfiniBand Managed Switch
- InfiniBand Subnet Management
- Hardware Removal
- Regulatory Compliance
- Installation of Switch Management Module

HP BLc QLogic 4X QDR InfiniBand Managed Switch and InfiniBand Switch Management Module Installation Guide 21
4. Close cover slowly, ensuring that the module connectors (see callout 1 in Figure 11) connect to the
motherboard connectors (see callout 1 in Figure 13).
Figure 13 Switch with Switch Management Module Cover Removed
5. Replace the screw that was removed in step 1 (see callout 1 in Figure 10) and tighten securely.
1