HP 5400R zl2 Installation and Getting Started Guide

4 Index
Index
Power LED
behavior during error conditions 5-4
behavior during self test 2-17
description 1-9
Power Status LEDs 1-10
behavior during self test 2-17
showing error conditions 5-4
power supply
connecting to a power source 2-22
installation cautions 1-19, 2-13
making redundant power connections 2-22
replacing 4-2
precautions
installing power supply 1-19, 2-13
mounting the switch in a rack or cabinet 2-6,
2-7
power requirements 2-6, 2-7
preparing the installation site 2-8
Proactive Network tools
diagnostics with 5-9
R
rack
mounting the switch in 2-17
rebooting the switch
to initialize changed module type 2-9
recycle statements D-1
redundant power connections 2-22
redundant power supply
installation cautions 1-19, 2-13
installing 2-12
slot for installing 1-18
regulatory statements C-9
replacing components
power supply 4-2
replacing hardware
fans 4-4
flash memory card 4-5, 4-6
Reset button
description 1-15
location on switch 1-15
restoring factory default configuration 5-13
resetting the switch
factory default reset 5-13
location of Reset button 1-15
troubleshooting procedure 5-10
routing features 1-22
S
safety and regulatory statements C-1
safety specifications A-3
selecting the Mode LED display 1-13
self test
Fault LED behavior 2-17
LED behavior during 2-16
Power LED behavior 2-17
Self Test LED behavior 2-17
Self Test LED
behavior during factory default reset 5-13
behavior during self test 2-17
description 1-9
showing error conditions 5-4
specifications
electrical A-1
environmental A-2
physical A-1
safety A-3
straight-through cable
pin-out B-9, B-11
use with fixed port configurations B-7
subnet mask, configuring 3-3
summary
of switch installation 2-4
switch
connecting to a power source 2-22
description 1-1
electrical specifications A-1
environmental specifications A-2
included parts 2-1
mounting in a rack or cabinet 2-17
mounting on a horizontal surface 2-21
physical specifications A-1
switch chassis
LED descriptions 1-9
switch modules
booting the switch to initialize changed module
type 2-9
hot swapping 2-28
installing 2-8
LEDs descriptions 1-12
list of available types 1-20
switch operation
verifying after installation 2-14
Switch Setup screen 3-2
configuring a subnet mask 3-3
configuring an IP address 3-3
field descriptions 3-3