HP 5400R zl2 Installation and Getting Started Guide

2-19
Installing the HP 5400R zl2 Switches
Installation Procedures
Installing the HP 5400R zl2
Switches
2. Partially install a screw into the top hole of a pair of holes that are 0.5 inches
apart in each rack/cabinet upright as shown in the illustration below.
Ensure that the screws are at the same level in each upright.
Partially install a
screw into the top
hole of a close (0.5-
inch) pair on both sides
Figure 2-7. Mounting screw positioning
3. Place the switch in the rack and lower it so the notches in the bottom of
the bracket slide onto the screws, then tighten these screws.