HP Power over Ethernet (PoE/PoE+) Planning and Implementation Guide
13-45
Planning and Implementation for the HP 5400zl/8200zl Switches
Configuration Examples
In this configuration, EPS 2 of the Power Supply Shelf can be connected to
either EPS 1 or EPS 2 of either switch.
Figure 13-22.Connecting the EPS to two switches, one 5412zl and one 8212zl
To Power
Source
To Power Source
To Po we r
Source
To Po we r
Source
To Po we r
Source
EPS Cables
EPS 1
EPS 2
EPS 2
EPS 1
5412zl
8212zl










