HP 5400R zl2 Installation and Getting Started Guide

2-21
Installing the HP 5400R zl2 Switches
Installation Procedures
Installing the HP 5400R zl2
Switches
5. Align each Cable Manager such that two holes in the Cable Manager align
with two empty holes in the Rack Mount Bracket and secure with two
screws.
6. Snap the Cable Retainers into the arms of the Cable Managers.
Horizontal Surface Mounting
Place the switch on a table or other horizontal surface. Use a sturdy surface
in an uncluttered area. You may want to secure the networking cables and
switch power cord to the table legs or other part of the surface structure to
help prevent people from tripping over the cords.
Note Ensure the air flow is not restricted around the sides and back of the switch.
6. Install the Grounding Wire
If a grounding wire is to be attached to the switch chassis, the grounding lug
must be removed and a wire crimped to it and the grounding lug must be
reinstalled.
1. Use a #1 Phillips (cross-head) screwdriver and remove the grounding lug
and two screws from the back of the switch.
2. Crimp the grounding lug to a properly grounded grounding wire.
3. Re-attach the grounding lug to the switch with the two screws.
Figure 2-10. Attaching grounding lug to the 5400R zl2 switch