SuperStack II Advanced RPS Management Module User Guide

DUA1608-0AAA01
Before You Start 2-3
Before You Start
The SuperStack II Advanced RPS Management Module will only
operate with the SuperStack II Advanced RPS. You will need a
10BASE-T cable for connection to your Ethernet network and a
serial cable to configure your Management Module. You may also
use the serial cable and for management via a modem, if required.
Installing the Management Module
To install the Management Module, you need access to the cables
that are connected to your network.
WARNING:
Ensure that the Advanced RPS is disconnected from
the mains. Both power cables must be removed.
AVERTISSEMENT:
S’assurer que le système Préliminaire RPS est
déconnecté du secteur d’alimentation. Les deux câbles doivent
être retirés.
WARNUNG:
Versichern Sie sich, daß das Advanced RPS von Netz
getrennt ist. Beide Netzstecker müssen entfernt werden.
1
Remove the blanking plate on the SuperStack II Advanced RPS rear
panel. Retain the blanking plate and screws for re-use if the
Management Module is removed. The plate is important to the
flow of cooling air to the unit.