R3204P16-HP Load Balancing Module High Availability Configuration Guide-6PW101

69
Configuration prerequisites
Before you configure a schedule for an NQA test group, complete the following tasks:
Configure test parameters required for the test type.
Configure the NQA server for tests that require cooperation with the NQA server.
Scheduling an NQA test group
Follow these steps to configure a schedule for an NQA test group:
To do… Use the command…
Remarks
Enter system view system-view
Configure a schedule for an
NQA test group
nqa schedule admin-name
operation-tag start-time
{ hh:mm:ss [ yyyy/mm/dd ] |
now } lifetime { lifetime |
forever }
Required
now specifies the test group starts testing
immediately.
forever specifies that the tests do not stop
unless you use the undo nqa schedule
command.
Configure the maximum
number of tests that the NQA
client can simultaneously
perform
nqa agent max-concurrent
number
Optional
The default settings for this command vary
with device models.
NOTE:
After an NQA test group is scheduled, you cannot enter the test group view or test type view.
System adjustment does not affect started or completed test groups. It only affects test groups that have
not started.
Displaying and maintaining NQA
To do… Use the command…
Remarks
Display history records of NQA test groups
display nqa history [ admin-name
operation-tag ]
Available in
any view
Display the results of the last NQA test
display nqa result [ admin-name
operation-tag ]
Display statistics of test results for the
specified or all test groups
display nqa statistics [ admin-name
operation-tag ]
Display NQA server status display nqa server status