R3721-F3210-F3171-HP High-End Firewalls Getting Started Guide-6PW101
80
Ste
p
Command
Remarks
4. Add commands to the job.
• Configure a command to run at a
specific time and date:
time time-id at time date
command command
• Configure a command to run at a
specific time:
time time-id { one-off |
repeating } at time [ month-date
month-day | week-day
week-daylist ] command
command
• Configure a command to run
after a delay:
time time-id { one-off |
repeating } delay time command
command
Use any of the commands.
Changing a clock setting does not
affect the schedule set by using the
time at or time delay command.
Scheduled job configuration example
Network requirements
Configure scheduled tasks on Firewall to enable interfaces GigabitEthernet 0/1, GigabitEthernet 0/2,
and GigabitEthernet 0/3 at 8:00 and disabled them at 18:00 on working days every week, to control
the access of the PCs connected to these interfaces.
Figure 52 Network diagram
Configuration procedure
# Enter system view.
<Firewall> system-view
# Create scheduled job pc1, and enter its view.
[Firewall] job pc1
# Configure the job to be executed in the view of GigabitEthernet 0/1.
[Firewall-job-pc1] view gigabitethernet 0/1
# Configure the firewall to start GigabitEthernet 0/1 at 8:00 on working days every week.