R3721-F3210-F3171-HP High-End Firewalls High Availability Configuration Guide-6PW101

117
Ste
p
Command
Remarks
1. Enter system view.
system-view N/A
2. Configure a schedule for an
NQA test group.
nqa schedule admin-name
operation-tag start-time { hh:mm:ss
[ yyyy/mm/dd ] | now } lifetime
{ lifetime | forever }
now specifies the test group starts
testing immediately.
forever specifies that the tests do
not stop unless you use the undo
nqa schedule command.
3. Configure the maximum
number of tests that the NQA
client can simultaneously
perform.
nqa agent max-concurrent number
Optional.
By default, the maximum number is
2.
NOTE:
After an NQA test group is scheduled, you cannot enter the test group view or test type view.
System adjustment does not affect started or completed test groups. It only affects test groups that have
not started.
Displaying and maintaining NQA
Task Command
Remarks
Display history records of NQA
test groups.
display nqa history [ admin-name operation-tag ] [ |
{ begin | exclude | include } regular-expression ]
Available in
any view
Display the current monitoring
results of reaction entries.
display nqa reaction counters [ admin-name
operation-tag [ item-number ] ] [ | { begin | exclude |
include } regular-expression ]
Display the results of the last NQA
test.
display nqa result [ admin-name operation-tag ] [ |
{ begin | exclude | include } regular-expression ]
Display statistics of test results for
the specified or all test groups.
display nqa statistics [ admin-name operation-tag ] [ |
{ begin | exclude | include } regular-expression ]
Display NQA server status.
display nqa server status [ | { begin | exclude |
include } regular-expression ]
NQA configuration examples
ICMP echo test configuration example
Network requirements
As shown in Figure 50, configure NQA ICMP echo tests to test whether the NQA client (Firewall) can
send packets through a specified next hop to a specified destination (Device A) and test the round-trip
time of the packets.