Brocade Web Tools Administrator's Guide v6.1.0 (53-1000606-02, June 2008)

204 Web Tools Administrator’s Guide
53-1000606-02
Configuring an FCIP interswitch/interfabric link
17
FIGURE 95 GigE Port Configuration wizard
Configuring the FCIP interfaces, routes, and tunnels
The buttons and options you need to perform configuration tasks are available in Advanced Mode.
1. Click a port in the Switch View to open the Port Administration window.
2. Click the GigE Ports tab.
3. From the tree on the left, select the port you want to configure.
4. Click the General subtab.
5. Click the Edit Configuration button.
The GigE Port Configuration wizard opens. The fields are populated with the current
configuration values.
6. Follow the steps in the wizard.
The wizard guides you through the process of creating an IP interface, an IP route, and the FCIP
tunnel.
7. After you complete the steps in the wizard, verify the setup.
a. Click the IP Interfaces subtab to verify the IP interfaces.
b. Click the IP Routes subtab to verify the IP routes.
c. Click the FCIP Tunnels subtab to verify the FCIP tunnels.
If there is something missing from the setup, see the tasks in “Managing the FCIP tunneling
service” on page 205 for detailed instructions for adding or editing the components.
8. Repeat the above steps on the remote switch.