HP StorageWorks SAN Director Installation Guide (A7393-90009, May 2007)

SAN Director installation guide 135
5 Installing the optional B-Series MP Router blade
This chapter provides the following information:
Installation requirements, page 135
Items included with the B-Series MP Router blade, page 136
Installing and configuring the B-Series MP Router blade, page 136
Recommendations for cable management, page 141
Installation requirements
The B-Series MP Router blade can only be installed in a 4/256 SAN Director model. Up to two
B-Series MP Router blades can be installed in a single chassis in any of the slots 1 through 4 or 7
through 10.
To install and operate the B-Series MP Router blade successfully, verify the following:
The 4/256 SAN Director has an available slot in which to install the B Series MP Router blade.
The 4/256 SAN Director is configured in chassisConfig mode 5. Enter the
chassisConfig command to view the current mode. Note that a change to the
chassisConfig mode requires a reboot and is disruptive to switch operation.
The 4/256 SAN Director operates with Fabric OS 5.1.x or higher installed.
The 4/256 SAN Director must have four (4) power supplies installed prior to installing the
B-Series MP Router blade.
To ensure adequate cooling when installing two B-Series MP Router blades, HP recommends that
you have one blade in slots 1 through 4 and another blade in slots 7 through 10.
The B-Series MP Router blade behavior is to power up in an offline (disabled) state until the ports
are configured, then use the portcfgpersistentenable command to enable the ports.
Verify that the ambient air temperature does not exceed 40
° C (104° F) and that the ambient
humidity remains between 20% and 85% while the switch is operating.
For MP Router blade supported configurations, see the HP StorageWorks SAN design reference
guide:
http://www.hp.com/go/sandesignguide