HP StorageWorks SAN Director Installation Guide (A7393-90009, May 2007)
SAN Director installation guide 47
Attaching the retainer nuts—for rails with square holes
If you are installing the 14U Rack Mount Kit in rails with square holes (like the 10,000 series 42U
rack), attach retainer nuts to vertical rails on service side of the rack as follows.
1. First, count up 41 square holes from the 1U location.
2. Attach the four retainer nuts to the two rails at the front of the rack (service aisle side). See Figure
Figure 7.
Figure 7 Installing the retainer nuts on the rails
Attaching the clip nuts—for rails with round holes
If you are installing the 14U Rack Mount Kit in rails with round holes, use the instructions in this
section. Attach the clip nuts to the vertical rails on the service side of the rack as follows.
1. Count up 41 round holes from the 1U location.
2. Attach the four clip nuts to the two rails at the front of the rack (service aisle side). See Figure 7.
1 Upper retainer
nuts, installed in
hole #41
2 Lower retainer
nuts, installed in
hole #9
3 1U location