Installation Guide, Third Edition - Server Expansion Unit

Chapter 4
35
4 Cabling and Power Up
This chapter describes how to install the cables between the server and the Server Expansion Unit. A
manageability link cable and four SBA cables must be installed. Two SBA cables provide cell to I/O
connectivity for cell 2 in the server and the other two SBA cables provide cell connectivity for cell 3 in the
server. When the cables are installed, the next steps are to configure the MP port, then apply 48V to the
Server Expansion Unit and to the server.