Installation Guide, Third Edition - Server Expansion Unit
Chapter 4
Cabling and Power Up
HP 9000 rp8400 server Upgrade and SBA Cable Installation
43
Upgrade Procedures
It is necessary to remove the top and side covers (on the left side of the server as you face the front of the
server chassis) to route the cables and to gain access to the backplane.
Figure 4-2 Top Cover Removal
Removing the Server Top Cover
Step 1. Connect to ground with a wrist strap.
Step 2. Loosen the blue retaining screws securing the cover to the chassis.
Step 3. Slide the cover toward the rear of the chassis.
Step 4. Lift the cover up and away from the chassis.
Step 5. Place the cover in a safe location.
Retaining Screw