Installation Guide, Third Edition - Server Expansion Unit

Chapter 4
Cabling and Power Up
HP 9000 rp8400 server Upgrade and SBA Cable Installation
46
NOTE A fully loaded cell board weighs 27.8 lb. Support both side edges when removing the cell board
from the chassis.
Only cell boards installed in slot 2 and slot 3 must be removed during the shroud upgrade
procedure.
Figure 4-5 Cell Board Location
Attaching SBA Shrouds to the HP 9000 rp8400 server Backplane
Step 1. Ensure the server has already been shut down and the power cords are removed from the server.
Step 2. Push in on both of the extraction levers to unlock the cell board.
Slot 0
Slot 1
Slot 2
Slot 3