Installation Guide, Third Edition - Server Expansion Unit
Chapter 4
Cabling and Power Up
HP 9000 rp8400 server Upgrade and SBA Cable Installation
47
Step 3. Pull the extraction levers out on each end of the cell board for cell boards located in slot 2 and slot 3.
Figure 4-6 Cell Board Extraction
Step 4. Slide each cell board out of the chassis and place on an ESD protective mat, ensuring the cell
boards are placed such that they are returned to the same slot when replaced in the chassis.