Installation Guide, Third Edition - Server Expansion Unit

Chapter 4
Cabling and Power Up
HP Integrity rx8620 server and HP 9000 rp8420 server SBA Cable Installation
73
Cabinet Label Placement
There are two cabinet labels that need to be attached to the server and to the Server Expansion Unit if they
were not already attached at the factory. The label “Cabinet 8” must be attached to the Server Expansion
Unit and is installed to the left of the PCI slot label. The label “Cabinet 0” must be attached to the server and
is installed to the left of the PCI slot label. See Figure 4-18 for label placement.
Figure 4-32 Cabinet Label Placement
Place “Cabinet 8”
label here.
Place “Cabinet 0”
label here.