Installation Guide, Third Edition - Server Expansion Unit
Chapter 4
Cabling and Power Up
Voltage Check
75
Voltage Check
This section provides voltage check information for use on the customer site. The emphasis focuses on
measuring the voltages at the power cord plug end specified as an IEC-320 C19 type plug. This is the end that
plugs directly into the back of the Server Expansion Unit chassis.
NOTE These procedures must be performed for each power cord that will be plugged directly into the
back of the Server Expansion Unit. If the expected results from this procedure are not observed
during the voltage check, refer to the next section titled “Voltage Check (Additional
Procedure).”