HP BladeSystem c3000 Tower Enclosure Setup and Installation Guide
Installing components 21
5.
Prepare the blade for installation.
6. Install the blade in the empty bay.
NOTE: If you plan to install four HP Active Cool Fans, you can install up to two full-height
blades. Populate device bay 1 first, then populate device bay 2.
If you plan to install six HP Active Cool Fans, blades can be installed in any configuration.
For more information, see "Installing fans" and "Full-height device bay numbering (on page 12)."
CAUTION: To prevent improper cooling and thermal damage, do not operate the blade or the
enclosure unless all hard drive and device bays are populated with either a component or a
blank.
7. Install blanks in any empty bays ("Creating a full-height device bay blank" on page 24).










