Workgroup System and Cluster Platform Express Overview and Hardware Installation Guide

B.1.4 CP Workgroup System with an Optional InfiniBand Interconnect
Figure B-4 shows a CP Workgroup System with an optional InfiniBand interconnect.
Figure B-4 CP Workgroup System with an Optional InfiniBand Interconnect
16
15
1
14
19
2
3
4
5
13
12
11
7
6
10
9
8
17
20
18
The following list describes the callouts in Figure B-4:
1. c3000 enclosure
2. Compute node 3
3. Compute node 2
4. Compute node 1
5. Control node
6. Compute node 7
7. DVD drive
8. Compute node 6
9. Compute node 5
10. Compute node 4
11. Administrative network
12. iLO access
13. Onboard Administrator
14. LAN or direct connect
15. External file sharing (CIFS, NFS)
16. Clients (for example, HP laptops)
17. HP GbE2c switch
18. Connection from control node NIC1 to the HP GbE2c switch
19. Connection from NIC2 on the control node to the HP GbE2c switch
20. HP 4X DDR InfiniBand switch module
B.1 Example Configuration Diagrams 67