24 Node Cable Management Kit Installation Guide

1 Preparing for Installation
1.1 Audience
This guide is intended for HP service representatives and other persons trained to install hardware
options in the HP 10000 Series Rack. Such persons are expected to understand the hazards of
working in this environment and to take suitable precautions to minimize danger to themselves
and others.
1.2 Documentation Resources
You can download the documentation for components referenced in this installation guide from
the following locations:
HP 10000 Series Rack (Documentation option):
http://h18004.www1.hp.com/products/servers/proliantstorage/racks
HP Cluster Platform:
http://docs.hp.com/
1.3 Kit Description
The InfiniBand 24 node cable management kit described in this manual is designed to align and
support cables that lead from a cluster platform's system interconnect to the PCI interface card
installed in each server (node). The kit provides strain relief for the cables connected to the
individual InfiniBand interconnect ports and ensures a good connection. It also ensures the
correct bend radius for the cable and provides channels for cable routing and cable management.
One 24 node cable management kit is required for each 24 port system interconnect.
NOTE: The 24 node cable management kit is designed to support 0.357 inch (9.0678 mm)
diameter, 0.438 inch (11.1252 mm) diameter, and 0.309 inch (7.8486 mm) diameter InfiniBand
cables. Consult the documentation supplied with your cluster before installing the brackets and
routing the cables.
1.4 Kit Contents
Verify that the 24 node cable management kit contains the following components:
Packaging and documentation.
The bracket hardware shown in Figure 1-1.
Figure 1-1 Bracket Hardware (Top, Middle, Bottom)
1
2
3
The 24 node cable management kit is used in HP Cluster Platform Express (CPE)
configurations, however, it might be adaptable for other HP Cluster Platform cable
6 Preparing for Installation