AC089A Cable Management Bracket Installation Guide (supersedes ProLiant DL380 G4 Cable Management Bracket Installation Guide)

1.6 Required Resources
To install the kit, you need the following resources:
Tools:
— A 6-inch long #2 (medium) Phillips (Posidrive or cross-point) screwdriver, or #2 bit for
a power screwdriver.
— Cage-nut insertion tool (shipped with the rack) or a flat-bladed screwdriver.
— Marker pen or masking tape.
Resources: A sample cable of the type used by the system interconnect.
Environment:
— A work surface adjacent to the rack.
— A stable work platform or step stool that lets you safely reach the servers installed in
the upper part of the rack.
8 Preparing for Installation