HP DL1000 Cable Management Kit Installation Guide (580771-doc)

2 Installing the Cable Management Kit
The location of the cable management kit depends on the rack position occupied by the server
chassis. Align each bracket with the InfiniBand connector ports on the server so that the bracket's
mounting flange is level with the InfiniBand ports.
2.1 Installing the Cable Management Kit
To install the cable management kit, follow these steps:
1. Identify and mark the two holes in the rack's rear mounting rails (callouts 1 and 3 in
Figure 2-1) and clip the 10-32 cage nuts (callout 4 in Figure 2-1) into the square holes.
2. Fasten the top and bottom brackets (callouts 2 and 6 in Figure 2-1) using the four 10-32
screws (callout 5 in Figure 2-1).
Figure 2-1 Installing the Cable Management Brackets
1
2
3
6
4
5
2.2 Securing the InfiniBand Cables
After installing the cable management brackets (callouts 1 and 2 in Figure 2-2) you must install
the Infiniband cables. Once the InfiniBand cables (callout 3 in Figure 2-2) are installed, you can
secure them to the cable management brackets using the 3.5-inch Velcro straps (see detailed view
in Figure 2-2).
2.1 Installing the Cable Management Kit 9