HP ProCurve 2610 Series Rail Kit Installation Guide (508783-doc)
3 Cabling and Power
Follow the installation instructions for your cluster configuration bundle that was shipped with
this kit. See Section 1.2 for information on where you can obtain product documentation resources.
It is important that you connect the servers to the correct network cables and interconnect cables,
and that you apply power in the correct sequence.
15