Linux Clusters QsNetII Cable Management Kit Installation Guide

Figure 7: Cabling the Interconnect
1
3
2
zk-2084
5. Slide the cable forward until its connector aligns with the port (callout 3 in
Figure 7), and secure the cable by pushing only on the metal connector
body (callout 2 in Figure 7). Ensure that you keep the connector level and
square with the port as you insert it.
6. Repeat steps 2 through 5 for all remaining cables. If you are installing an
interconnect into the upper part of the rack, proceed to step 7. Otherwise, the
installation procedure is compete at this point.
7. If you are installing an interconnect into the upper part of a dual-interconnect
IBB, you must route the cables down the guide plate and support them by
using the cable straps as shown in Figure 2, callout 4. Use the appropriate
length strap for the cable bundle diameter. You need only use enough straps to
keep the cable bundles tight to the plate, so that they do not interfere with the
servicing of interconnect components. Figure 8 shows how to attach one of
the straps to the cable guide plate.
Figure 8: Bundling and Routing the Cables
Z
Y
X
zk-2079
Starting from the top of the cable guide plate and working downwards, use the
following procedure to attach the straps:
a. Using the leftmost screw holes in the cable guide plate, attach the strap
by using an M5 x 10 mm Torx screw (callout 1).
b. Feed the end of the strap through the cutout in the left of the cable guide
plate (callout 2).
QsNet
II
Cable Management Kit Installation Guide 9