Linux Clusters QsNetII Cable Management Kit Installation Guide
12 Removing the Cable Management Kit
Remove the rear cable management brackets and bars only if you are removing an
entire interconnect chassis. You remove the interconnect chassis by sliding it out
of the rear of the rack. If the cables are not labeled for their respective ports, you
might want to label them prior to disconnecting any cables.
Remove the rear cable management brackets and bars as follows:
________________________ Caution _______________________
Before beginning any component removal procedures, power off the
interconnect by using the breaker switch at the power distribution
unit unless the component is designated as hot-swappable. Consult
the documentation for you cluster to confirm whether a component is
hot-swappable. If you intend to remove the interconnect chassis from the
rack, ensure that all cables (such as network, power and interconnect)
are disconnected as described in the Service documentation for the
model of interconnect.
1. Disconnect the cables and remove them from the hooks. Support any
unfastened cables so that their specified bend radius is not exceeded.
2. For each of the eight cable management bars, pull down on its spring-loaded
retainer pin and swing the bar down 90 degrees.
3. Beginning with the upper rear bracket, remove the four M6 X 16 mm pan-head
screws that retain it to the rack. If you intend to replace the kit, do not remove
the cage nuts from the rack columns.
4. If you are replacing an interconnect chassis, do not disassemble the
cable management bars from the lower brackets. However, because the
bracket-and-bar assembly is heavy, two people are required to remove it safely.
One person should support the weight of the assembly while another person
removes the four M6 X 16 mm pan-head screws from the lower bracket.
5. You do not need to remove the cable guide plates. However, take care to
route any disconnected cables out of the way of the interconnect before you
attempt to remove it.
_____________________ Warning _____________________
The interconnect is heavy and two persons are required to remove
it from the rack. Consult the service documentation for your cluster
before attempting to remove the interconnect chassis from the rack.