Quadrics QsNetII Interconnect
Table 8-1: 16/32-Port Interconnect Rail Kit
Callout
Item Description
Quantity
1
Front track, which slides into the rear track and
mounts on the front rack columns
2
2
Rear track, which mounts on the rear rack columns
2
3
Slide rails that mount on the interconnect chassis
2
4
Cable management slides (Left and right, forming part of the
cable management assembly, which slides onto the track).
2
5
Cable management lower retainer, containing channels into
which you fit the interconnect link cables,
2
6
Cable management upper retainer, which secures the
cables into their channels,
2
Table 8-2 lists the following fasteners that are provided with the rack kit:
Table 8-2: Rail Kit Fasteners
fastener
Quantity
M4 x 10 mm cross-head screws with captive compression washers, used
to secure the rail kit to the rack and to the interconnect chassis.
10
M4 x 10 mm knurled-head bolt, used to assemble the
cable management unit.
8
An additional 12 cage nuts and screws (not supplied) are required to secure the
rail kit to the rack.
shows the cable management assembly.
8-2 Maintenance of the 16/32-Port Interconnect