HP Cluster Platform Site Preparation Guide

Table A-1 Customer and HP Information Worksheet (continued)
E-mail:Telephone:Secondary customer
contact:
E-mail:Telephone:Traffic coordinator:
HP Information
Order No:
E-mail:Telephone:Sales representative:
E-mail:Telephone:Site Surveyor:
Survey Date:
Delivery Date:
A.3.2 Site Inspection Checklists
Use the worksheet in Table A-2 to perform a site inspection.
Table A-2 Site Inspection Worksheet
Comment or DateCheckItem
NY
Computer Room
Is a floor plan complete?
Is the service space adequate?
Is access to the site or computer room restricted?
Is the computer room structurally complete? If not,
what is the expected date of completion?
Is a raised floor installed and in good condition?
What is the floor to ceiling height? [7.5 ft (228 cm)
minimum]
Is the raised floor adequate for equipment loading?
Are floor tiles in good condition and properly
braced?
Is the cable routing planning complete?
Is the connection to the customer's LAN/WAN
planned?
Is a metallic particulate test required?
Power and Lighting
Are lighting levels adequate for maintenance?
Are there AC power outlets available for servicing
needs?
Does the input voltage correspond to equipment
specifications?
Does the input frequency correspond to equipment
specifications?
Are lightning arrestors installed inside the building?
Is power conditioning equipment installed?
Is there a dedicated branch circuit for equipment?
A.3 Site Inspection 47