HP Cluster Platform Workgroup System Tower Hardware Installation Guide

Figure 3-2 Remove the Box
1
5. Remove the front section of the bottom cushion (callout 2) along with the ramp (callout 1),
as shown in Figure 3-3.
Figure 3-3 Remove the Ramp and Front Cushion
2
1
6. Attach the ramp to the plywood deck using the velcro strips, as shown by callout 1 in
Figure 3-4.
24 Unpacking and Removing a Workgroup System Tower from a Pallet