
7. Gently roll the unit down the ramp, as shown by callout 1 in Figure 3-5 and Figure 3-6.
Figure 3-5 Roll the Unit Down the Ramp
Figure 3-6 Roll the Unit to the Installation Location
Proceed to Chapter 4 and start up the system.
26 Unpacking and Removing a Workgroup System Tower from a Pallet