HP Cluster Platform Workgroup System Tower Hardware Installation Guide

Figure A-4 Example Configuration 4: 5kVA - 7kVA, N+1 Redundant Enclosure with 32A PDU,
and C13 Extension Bars
5
7
7
7
2
2
6
4
4
4
1
3
3
3
3
3
The following list describes the callouts in Figure A-4:
1. Workgroup System Tower rear view
2. 1200W power supplies (six)
3. Six C13–C14 power cords
4. Power strip cords connected to the PDU (three)
5. 32A International PDU (252663-B31 IEC 309-32A)
6. PDU power cord to site power
7. C13 extension bar power strips (three)
Figure A-5 provides an example of a 3kVA 5kVA, N+N redundant enclosure with 16A 3-phase
PDU, C20-C13 power cords (not supplied by HP).
35