HP Cluster Platform Workgroup System Tower Hardware Installation Guide

List of Figures
1-1 Workgroup System Tower Example Front View..........................................................................14
1-2 Workgroup System Tower Example Rear View............................................................................15
1-3 HP GbE2c Ethernet Blade Switch..................................................................................................17
1-4 4X DDR InfiniBand Interconnect...................................................................................................18
3-1 Open the Top of the Cardboard Box.............................................................................................23
3-2 Remove the Box.............................................................................................................................24
3-3 Remove the Ramp and Front Cushion..........................................................................................24
3-4 Attach the Ramp............................................................................................................................25
3-5 Roll the Unit Down the Ramp.......................................................................................................26
3-6 Roll the Unit to the Installation Location......................................................................................26
4-1 CP Workgroup System Tower with a Server Blade Control Node...............................................28
A-1 Example Configuration 1: 4kVA, N+N Redundant Enclosure with a 32A International PDU....32
A-2 Example Configuration 2: 2.7kVA, N+N Redundant Enclosure with 16A PDU, C20-C13 Power
Cords (not supplied by HP)..........................................................................................................33
A-3 Example Configuration 3: 3kVA, N+1 Redundant Enclosure with a 16A PDU, C20-C13 cords
(not supplied by HP).....................................................................................................................34
A-4 Example Configuration 4: 5kVA - 7kVA, N+1 Redundant Enclosure with 32A PDU, and C13
Extension Bars...............................................................................................................................35
A-5 Example Configuration 5: 5kVA, N+N Redundant Enclosure with 16A 3-Phase PDU, C20-C13
Power Cords (not supplied by HP)...............................................................................................36
A-6 Example Configuration 6: 5kVA, N+1 Redundant Enclosure with 16A 3-Phase PDU, and
C20-C13 Power Cords (not supplied by HP)................................................................................37
5