HP XP P9000 Replication Manager Software 7.5.0-00 User Guide (TB584-96070, July 2013)

4. On the 3. Group Management page, create a copy group and assign a pair group to the copy
group.
5. Repeat the operations for creating a copy group and assigning a pair group to the copy group.
Related topics
Creating pairs and pair groups, page 156
Copy type requirements for pair configuration definitions, page 166
Permitted topologies for cascade and multi-target configurations, page 168
About multi target and cascade copy pair configurations, page 166
Creating a 3DC multi-target configuration
To create a 3DC multi-target configuration that uses the delta resync function:
1. Create Continuous Access Synchronous and Continuous Access Journal pair groups in a multi-target
configuration.
2. With the secondary volume of the Continuous Access Synchronous pair selected, click Add Group.
3. Specify the copy type option as Cnt Ac-J (3DC Delta).
Related topics
About delta resync, page 169
Creating pairs and pair groups, page 156
Creating copy groups, page 162
Defining copy groups in a multi-target or cascade configuration, page 169
Scheduling and managing tasks
This module discusses information about tasks and procedures for scheduling and managing tasks:
About tasks, page 170
About task statuses, page 172
About task types (open systems), page 172
About task types (mainframe systems), page 173
Scheduling tasks, page 173
Viewing a list of tasks, page 176
Canceling tasks, page 176
Deleting tasks, page 177
About tasks
A task is a type of operation, such as changing the status of a copy pair or creating a copy pair or
copy group based on a specified schedule. Tasks are managed based on copy groups as functional
units. Multiple tasks created for the same copy group using the Pair Configuration Wizard are
collectively known as associated tasks.
There are three methods to execute operations defined in a task:
Immediate execution
Scheduled execution
Managing pair life cycle170