HP XP P9000 Replication Manager Software 7.5.0-00 User Guide (TB584-96070, July 2013)
• On the day that daylight savings time starts, a task scheduled for the skipped time period (for
example, from 2:00 to 2:59) is executed one hour later. For example, a task scheduled for
2:30AM on that day is executed at 3:30AM.
• When daylight savings time ends, an overlapping time period occurs and a task scheduled
for that time is executed once. For example, if a task is scheduled for 1:30AM, the task is only
executed for the first instance of 1:30AM and not the second (when the time change occurs).
For best results, do not use the Change Pair Status Wizard or Edit Task dialog box to schedule a
task that will be executed when the system time will be adjusted for daylight savings time.
Related topics
• About copy pair status, page 209
• Changing the copy pair status for each copy group or container, page 233
• Changing the copy pair status for each copy pair, page 232
• Changing the copy pair status for multiple copy pairs (batch operation), page 235
Pair status transitions (when the target is a copy group)
The following table lists possible pair status transitions for each combination of copy pair state and
copy type, when the target is a copy group.
Pair status conditions where the pair status can be changed (1/2) (when the target is a copy group)
Continuous Access
Asynchronous
Continuous Access
Synchronous
Business CopyCopy pair state
split
resync
restore
delete
split
resync
restore
delete
split
resync
restore
delete
Error (PSUE)
------Error (HOLDER)
split
resync
restore
delete
split
resync
restore
delete
--Error in LUSE*
split
resync
restore
delete
split
resync
restore
delete
split
resync
restore
delete
Split (Full)
split
resync
restore
delete
split
resync
restore
delete
split
resync
restore
delete
Split (SW)
------Split (HOLD)*
Managing pair life cycle222