HP Installation Guide, HP PCIe 2 port (AT111A/CN1100E) FlexFabric Adapter, Edition 2

9. Apply the power:
a. Verify that the CNA is installed securely in the server.
b. Verify that the correct media is attached.
c. Plug in and power on the server.
d. Observe the Link and Activity LEDs to be sure the CNA connects to the switch.
10 Installing the adapter