HP StoreOnce B6200 Installation Planning and Preparation Guide (EJ022-90995, November 2013)

Please enter networking parameters below. They are required for the network configuration script.7.
1. All templates:
nl
Virtual Management Console VIF IP address, recommended to be the first address in your
contiguous IP range..............................................................................................
2. Templates 1 and 4 only, Management sub-net parameters
nl
If provided, must be on same sub-net as Virtual Management Console VIF
Start IP adress......................................................................................................
End IP address (must be contiguous)..................................................................................
Netmask....................................................................................................................
3. All templates, Data sub-net parameters
Start IP adress............................................................................................................
End IP address (must be contiguous)...............................................................................
Netmask.........................................................................................................................
4. Domain name (optional).............................................................................................
5. All templates:
nl
Gateway IP address
nl
.....................................................................................................................
Templates 1 and 4 only:
nl
Second gateway IP address.......................................................................................
nl
Which gateway to act as 'default'............................................................................
6. DNS server IP address(es) .................................................................................
nl
up to three......................................................................................................................
IMPORTANT: Your HP service specialist will provide you with a record of the Virtual IP addresses
after the network configuration has been completed. These are the addresses that you need to
connect to the B6000 Management Console (from the GUI or CLI) and to configure backup and
replication targets.
Do you have sufficient physical network connections for your template (see also table below)?8.
1. Number of switches per network.................................................................
(The recommendation is for two switches for each network to which you are connecting.)
2. Number of physical ports available:
1GbE..............................................................
10GbE..............................................................
Physical network connections
The installation requires the following physical network connections to the rack(s). See also Physical
Ethernet connection requirements (page 20).
4321Number of couplets
16 x 10GbE
nl
12 x 10GbE
nl
8 x 10GbE
nl
4 x 10GbE
nl
Template 1
16 x 1GbE12 x 1GbE8 x 1GbE4 x 1GbE
32 x 1GbE24 x 1GbE16 x 1GbE8 x 1GbETemplate 2
16 x 10GbE12 x 10GbE8 x 10GbE4 x 10GbETemplate 3
32 x 1GbE24 x 1GbE16 x 1GbE8 x 1GbETemplate 4
16 x 1GbE12 x 1GbE8 x 1GbE4 x 1GbETemplate 5
Network requirements 29