Overview
Use these instructions to set up the HP SN8000B 8-Slot
SAN Director as a standalone or rack-mounted unit.
These instructions provide basic configuration steps. For
detailed rack mount and configuration instructions, see
the HP SN8000B 8-Slot SAN Backbone Director Switch
Hardware Reference Guide and the Brocade Fabric OS
Administrator's Guide 7.0.0 available on the HP
Manuals website at h
ttp://www.hp.com/support/
manuals. From the main page, under storage, select
Storage Networking, and then select your switch.
Figure 1 (page 1) shows the port side of the director
with a full complement of optional blades installed. Your
configuration will vary if you purchased other optional
blades.
Figure 1 Port side of the HP SN8000B 8-Slot SAN
Director
4. FC 16-32 port blade1. Exhaust vent
5. Cable management comb2. Core Switch blade (CR16-8)
3. Control Processor blade (CP8)
Installation requirements
To set up the director for the first time, you will need:
• At least two people to safely slide the director from
one surface to another.
• 1/2-inch socket wrench (to remove pallet bolts).
• #2 Phillips screwdriver.
• Pallet jack.
• Hydraulic lift or assisted lift, able to raise to a
minimum of 140 cm (55 in) with a minimum
capacity of 113 kg (250 lb).
• Power cables and serial cable (included in the
accessory kit).
• Workstation with a serial port or terminal server
port and a terminal emulator application (such as
HyperTerminal).
• Fiber optic cables and cable ties.
• Three Ethernet IP addresses.
• Ethernet cabling for Telnet access (optional).
• Optical transceivers (optional). Order the optical
transceivers from HP.
For information about supported tranceivers, see
the HP SPOCK website at h
ttp://www.hp.com/
storage/spock. You must sign up for an HP Passport
to gain access.
Verify the operating environment
• Ensure that the installation location is 14 rack units
(14U) high, 61.1 cm (24.44 in) deep, and 43.74
cm (17.22 in) wide to install the director. 1U is
equal to 4.45 cm (1.75 in).
• Plan for cable management. Manage cables by
routing them through the cable management comb.
Do n o t place the director on the floor beca use doing
so impedes cable management and routing.
• HP recommends that you install the director with
the nonport side facing the air-intake aisle. This
prevents the fan from pulling in heated exhaust air.
You can install the director facing in either direction
if serviceability and cooling requirements are met.
• Air-intake and exhaust vents must have a minimum
of 5 cm (2 in) of clearance.
• The air temperature on the air-intake side must be
less than 40ºC (104ºF) during operation.
• Dedicated electrical branch circuits must meet the
following requirements:
◦ 200–240 VAC, 47–63 Hz (nominal: 50–60
Hz) (two branch circuits)
◦ Circuit breaker protection in accordance with
local electrical codes
◦ Supply circuit, line fusing, and wire size
adequate for the electrical rating on the chassis
nameplate
◦ Grounded outlets installed by a licensed
electrician and compatible with the power cords
Unpack and verify carton contents
WARNING! Use safe lifting practices when
moving the product. A fully populated HP
SN8000B 8-Slot SAN Director (with eight port
blades) weighs approximately 101.3 kg (223.0
lb) and requires a hydraulic or assisted lift to
install.
1. Remove the upper portion of the shipping crate.
a. Remove the straps securing the carton to the
pallet.
b. Lift the carton off the pallet. Leave the packing
foam on top of the chassis to hold the kits in
place during transf er to the installation location .
Save the shipping carton for future use.
c. Leave the chassis on top of the plastic shipping
tray.
2. Verify the carton contents. See Table 1 (page 2).
3. Use a pallet jack or other lift to transport the chassis
to the installation area. Doorways must be wider
than 91 cm (36 in).
4. Remove the rack mount kit, accessory kit, packing
foam, and antistatic plastic from the chassis.
5. Remove the chassis door.
6. Remo ve the cable management comb fr om the lower
port side of the chassis.
7. Position the lift at the installation location and lock
the wheels of the lift.
8. Use the lift to raise the chassis to the correct level
for installation. If you are installing the chassis in a
rack, follow the instructions provided in the rack kit,
or in the HP SN8000B 8-Slot SAN Backbone
Director Switch Hardware Reference Guide
available on the HP website at h
ttp://
www.hp.com/support/manuals.
9. Loosen the four bolts securing the director chassis
to the pallet and remove the brackets.
10. Gently slide the chassis onto the installation surface,
ensuring that it remains supported during the
transfer.
11. Orient the chassis so that the nonport side has
access to intake air.
12. Reinstall the cable management comb.