HP StorageWorks Enterprise Modular Library E-Series Getting Started (AD560-96030, September 2007)

Plug in the power cord. If you have more than one
power distribution unit (PDU), plug each PDU power
cord into a different AC power circuit to establish
redundancy.
12
Cabling checklist
Verify that all cabling is correct. Look at the back of the
library and compare to one of the following drawings.
LTO3 tape drives and e2400-FC 2Gb interface controller
13
1
6
2
3
4
5
1
6
2
3
4
5
8
8
8
8
12
1
2
3
4
5
6
7
11
10
9
1. Switch for the internal
network
2. Library robotics
controller
3. e2400-FC 2Gb
interface controller
4. To host
5. Interface manager card
6. To management station
7. Po r t A t o SA N
8. Tape drives
9. To port 1 on the switch
10. To port 2 on the switch
11. To port 3 on the switch
12. To port 4 on the switch
1. Library robotics
controller
2. e2400-FC 4Gb
interface
controller
3. To hosts
4. Interface
Manager card
5. To management
station
6. Tape Drives
1. Library robotics
controller
2. e2400-FC 2Gb
interface
controller
3. To hosts
4. Interface
Manager card
5. To management
station
6. Tape Drives
Library with LTO3 tape drives and e2400-FC 4Gb
interface controller
LTO4 tape drives
CAUTION! Do not connect this switch to your
local LAN. It is for internal library communication
only. Connecting this switch to a LAN could cause
library components to perform incorrectly or
report failures.