HP Comware 5 Debug Manual Vol 3

a. Field
b. Description
c.
Succeeded in processing IPC message: X
d.
MINM succeeded in
processing IPC
messages X. X
indicates the IPC
message type:
0Invalid operation type.
1Adding VSI.
2Deleting VSI.
3Configuring B-VLAN.
4Adding B-VLAN to the driver.
5Deleting B-VLAN to the driver.
6Deleting uplink port to the driver.
7Adding uplink port to the driver.
8Deleting uplink port.
9Deleting an uplink port by the port
number.
10Adding uplink port.
11 Enabling re-encapsulation.
12Disabling re-encapsulation.
13Adding B-MAC.
14Modifying B-MAC.
15Deleting all B-MACs.
16Deleting B-MACs of the specified
VSI.
17Deleting B-MACs of the specified VSI
and link ID.
18Deleting B-MACs of the specified
VLAN.
19Deleting B-MACs of the specified
port.
20Deleting B-MACs of the specified
VLAN and port.
21Deleting B-MAC by MAC.
22Aging B-MACs of the specified VSI.
23Aging B-MACs of the specified link
ID.
24Debugging.
25Setting board boot.
26Setting state for all boards.
27Setting state for the VSI.
28Processing B-MAC information
according to the B-MAC state.
29Displaying data.
30Configuring VSI when a board was
plugged.
31Configuring uplink port when a
board was plugged.
9