HP Intelligent Management Center v5.2 Branch Intelligent Management System Administrator Guide

2. On the Set Parameter page, set the parameters by selecting from the lists:
Parameter “Begin Time” and “End Time”—Specifies query time range.
Options include: Custom Range, Last Hour, Last Day, Last Week, and Last Month. If you
select Custom Range, you must specify:
Begin Time—The query start time.
End Time—The query end time.
CPE Group—A CPE group or select All CPEs.
3. Click OK.
The CPE Connectivity Detail Report displays the following information:
Break At—The time stamp when a break occurs.
Recovered At—The time stamp when a break is recovered.
Break Persistence (Minute)—The duration of a break measured by the minute.
Break Detail:
LT 5—The number of breaks recovered in less than 5 minutes.
5 to 10—The number of breaks recovered in 5 to 10 minutes.
10 to 30—The number of breaks recovered in 10 to 30 minutes.
30 to 60—The number of breaks recovered in 30 to 60 minutes.
GT 60—The number of breaks recovered in greater than 60 minutes.
Reason—The possible reason causing the break.
To export a CPE Connectivity Detail Report:
1. Click the Export icon located on the toolbar on the top of the report.
2. Select the desired export file format from the File Format list.
Options include: Crystal Reports (RPT), Adobe Acrobat (PDF), Microsoft Excel (97-2003),
Microsoft Excel (97-2003) Data-Only, Microsoft Word (97-2003) – Editable, Rich Text Format
(RTF), and Comma Separated Values (CSV).
3. Click Export.
Viewing a CPE Connectivity Summary Report
A CPE Connectivity Summary Report collects CPE connectivity details information of the specified
CPEs.
To view the CPE Connectivity Summary Report:
1. Locate and click CPE Connectivity Summary Report from the Report Template List pane.
2. On the Set Parameter page, set the parameters by selecting from the lists:
Parameter “Begin Time” and “End Time”—Specifies query time range.
Options include: Custom Range, Last Hour, Last Day, Last Week, and Last Month. If you
select Custom Range, you must specify:
Begin Time—Specifies the query start time.
End Time—Specifies the query end time.
CPE Group—Specifies a CPE group or select All CPEs.
3. Click OK.
122 BIMS reporting